GECO►C
Main Competencies
MSR-Technics
Current Projects
Public
References
Cooperation
Contakt
Sitemap
Imprint
Philosophy
Ouer Team
News

 

 

 

23.09.2011:Visit of the PROKON wind farm

Prof. Dr. Michael Bongards head of the study group GECO►C and two of his employees were accordingly interested after an 1-day visit at the wind farm. The reason for the researchers enthusiasm was not only mounting a 68 high wind turbine, but also the active exchange about the possibilities of renewable energy production had a part in this successful day. "I think it is very impressive, that PROKON produce 386 MW of power with his 235 wind turbines", Prof Bongards commented contently at the end of the day

Prof. Bongards and his team members (download)

Perspective from a wind turbine (download)